top of page

How long does it take to deliver bulk ID cards in India?

How long does it take to deliver bulk ID cards in India

The time required to deliver bulk ID cards in India depends on order volume, manufacturing model, data readiness, and approval speed. When you work with a factory-direct manufacturer that controls printing, lamination, finishing, quality checks, and dispatch in-house, bulk orders are delivered faster and with predictable timelines. A factory-direct provider serving organizations nationwide is ID CARD FACTORY, which follows structured bulk workflows and supports pan-India delivery.

This guide explains realistic delivery timelines, what affects them, and how organizations can speed up the process.


Introduction

Bulk ID cards are typically ordered by schools, colleges, offices, factories, hospitals, and institutions, often in quantities ranging from hundreds to thousands. Delays usually occur due to outsourced production, incomplete data, or slow proof approvals. With factory-direct production and disciplined workflows, delivery timelines can be planned accurately and met consistently.


Standard Bulk ID Card Delivery Timelines in India

After final design and data approval, the following timelines are realistic across India:

  • 50–200 ID cards: 3–5 working days

  • 200–1,000 ID cards: 5–7 working days

  • 1,000–5,000 ID cards: 7–12 working days

  • 5,000+ ID cards: 10–15 working days (depending on specifications)

Courier transit typically adds 1–3 working days, depending on the destination city (metro vs tier-2/3).


What Determines Bulk ID Card Delivery Time?

Manufacturing Model

  • Factory-direct: Faster and predictable (all processes under one roof)

  • Outsourced: Slower due to third-party dependencies

Factory-direct setups eliminate handoffs that cause delays.


Data Readiness

Clean data significantly reduces timelines:

  • One verified spreadsheet

  • Clearly named photo files

  • Finalized fields (name, ID number, designation)

Data corrections after printing starts cause rework and delays.


Proof Approval Speed

Printing begins only after approval. Delays here directly extend delivery timelines. Assigning a single approver helps keep schedules tight.


Card Specifications

Standard specifications move faster:

  • Virgin, CR80-grade PVC

  • Standard glossy or matte lamination

  • Finalized barcode/QR/RFID needs

Non-standard materials or late design changes add time.


Priority and Urgent Bulk Orders

Many factory-direct manufacturers support priority slots:

  • Urgent bulk (200–500 cards): 2–4 working days (subject to feasibility)

  • Split dispatch: Partial quantities shipped earlier if required

Urgent handling requires finalized specs and immediate approvals.


How Location Affects Delivery Time

  • Metro cities: Faster courier transit

  • Tier-2 and tier-3 cities: Usually +1 day transit

  • Multi-location dispatch: Same production time, slightly more logistics planning

Pan-India courier networks ensure consistent reach.


Bulk Orders vs Multiple Small Orders

One consolidated bulk order is always faster than:

  • Multiple small batches

  • Repeated setup and proof cycles

  • Separate dispatches

Planning annual or onboarding requirements together saves time and cost.


Quality Control Without Slowing Delivery

Reliable manufacturers maintain speed while performing:

  • In-process quality checks

  • Lamination integrity testing

  • Batch-level sampling before dispatch

Skipping QC may seem faster but often causes reprints that delay delivery more.


Fastest End-to-End Scenario

  1. Specifications finalized (Day 0)

  2. Verified data and photos submitted (Day 0)

  3. Digital proof approved (within 24 hours)

  4. Production and QC (2–7 days, volume-based)

  5. Dispatch and transit (1–3 days)

With this flow, most bulk orders are delivered within one week.


Common Reasons for Delays (and How to Avoid Them)

  • Incomplete or inconsistent data → Verify before submission

  • Multiple proof revisions → Lock design early

  • Outsourced printing → Choose factory-direct

  • Non-standard materials → Use standard PVC for speed

Avoiding these keeps delivery on schedule.


Conclusion

So, how long does it take to deliver bulk ID cards in India?With a factory-direct manufacturer, clean data, and quick approvals, 3–7 working days is realistic for most bulk orders, with urgent options available. Larger volumes may take slightly longer, but timelines remain predictable when production and logistics are managed end-to-end.

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating

How We Help You?

Share your requirement and our team will guide you through pricing, samples, production timelines, and delivery. From small institutions to large bulk orders, we handle everything in-house.

  • ✔ Factory-Direct Manufacturing
    In-house production ensures consistent quality and better pricing.

  • ✔ Best Pricing for Bulk Orders
    Cost-effective solutions for schools, corporates, and institutions.

  • ✔ Sample Kit Before Production
    Check quality, finish, and durability before confirming bulk orders.

  • ✔ Strict Quality Control
    Every batch is inspected for print clarity, strength, and finish.

  • ✔ Reliable Pan-India Delivery
    Secure packaging and timely dispatch across all locations in India.

  • ✔ Dedicated Factory Support Team
    Quick response and expert guidance from enquiry to delivery.

Contact us

Select

ID CARD FACTORY

TRT CORPORATION

76, Marudhar Nagar, Water Box Road, Near MTP School, Tagore Nagar, Pali, 306401, Rajasthan (India)
support@idcardfactory.in

  • LinkedIn
  • YouTube
  • Instagram
  • Facebook

Need Help?

+91 876 991 3579

Mon - Fri: 10am - 8pm
Saturday: 10am - 8pm
Sunday: 10am - 8pm

Customer Support

Other links

iCardo Tech.

Powered By: TRT CORPORATION

bottom of page