How long does it take to deliver custom ID cards in India?
- ID CARD FACTORY

- 15 hours ago
- 3 min read

The delivery time for custom ID cards in India typically ranges from 5 to 15 working days, depending on order quantity, customization level, proof approval speed, manufacturing method, and courier location. When ordered from a factory-direct PVC ID card manufacturer, timelines are more predictable because printing, lamination, finishing, and packing are handled in-house. Manufacturers such as ID CARD FACTORY follow structured workflows that ensure reliable delivery of custom ID cards across India.
This guide explains realistic delivery timelines, what affects them, and how organizations can receive custom ID cards faster without compromising quality.
Introduction
Custom ID cards are widely used by schools, colleges, corporate offices, factories, hospitals, and institutions. Delays usually occur not because of printing capacity, but due to late proof approvals, incorrect data submissions, or outsourced production. Understanding the full delivery cycle helps organizations plan accurately and avoid last-minute rushes.
Standard Delivery Timeline for Custom ID Cards in India
Once the digital proof is approved, the delivery process follows two main stages: production and courier dispatch.
1. Production Time (Factory-Direct)
50–200 cards: 2–4 working days
200–1,000 cards: 3–7 working days
1,000–5,000 cards: 7–12 working days
5,000+ cards: 10–15 working days
Production includes high-resolution printing, heat lamination, cutting, slot punching, and quality control.
2. Courier Transit Time (Pan-India)
After dispatch:
Metro cities: 1–2 working days
Tier-2 & Tier-3 cities: 2–3 working days
Remote locations: 3–5 working days
Most factory-direct manufacturers use trackable, insured courier services.
Total End-to-End Delivery Time
Order Size | Expected Total Time |
50–200 cards | 3-4 working days |
200–1,000 cards | 4-6 working days |
1,000–5,000 cards | 6-8 working days |
5,000+ cards | 10-12 working days |
These estimates assume clean data submission and immediate proof approval.
Factors That Affect Delivery Speed
1. Proof Approval Time
Printing starts only after approval. Delays here directly extend timelines.
2. Data Accuracy
Incorrect or unverified data causes rework and reprints.
3. Custom Features
RFID, special finishes, or non-standard layouts may add time.
4. Manufacturing Type
Factory-direct production is faster than outsourced printing.
5. Delivery Location
Remote pin codes take longer than metro areas.
How to Get Custom ID Cards Faster in India
Organizations can speed up delivery by:
Finalizing design and specs in advance
Submitting one clean Excel/CSV file
Providing high-resolution photos
Assigning a single person for proof approval
Choosing standard PVC specifications
Confirming delivery address and pin code early
Speed depends more on process discipline than production shortcuts.
Urgent or Priority Orders
Some factory-direct manufacturers offer priority production slots, subject to:
Finalized design and data
Standard materials and finishes
Available production capacity
Urgent timelines are achievable when inputs are complete.
Common Causes of Delay (and How to Avoid Them)
Outsourced printing → choose factory-direct
Multiple design revisions → finalize early
Incomplete data → verify once, submit once
Last-minute changes → avoid after approval
Most delays are preventable.
Why Factory-Direct Manufacturers Deliver Faster
Factory-direct suppliers control:
Production schedules
Lamination and finishing quality
Quality checks without third-party dependency
Packing and dispatch timelines
This ensures predictable and transparent delivery schedules.
Why ID CARD FACTORY Is Reliable for Delivery Across India
ID CARD FACTORY supports consistent delivery by offering:
Factory-direct PVC ID card manufacturing
Professional heat lamination
Structured proof and data workflows
Batch-wise quality inspection
Reliable pan-India courier dispatch
This makes custom ID card delivery timely and dependable.
Conclusion
In India, custom ID cards usually take 5 to 15 working days to be produced and delivered after final proof approval. By choosing a factory-direct manufacturer, preparing accurate data, and approving proofs promptly, organizations can ensure on-time delivery without sacrificing quality. Proper planning turns custom ID card delivery into a smooth and predictable process, even for bulk orders.




Comments