How long does it take to deliver ID cards in Jodhpur?
- ID CARD FACTORY

- 4 days ago
- 2 min read

The delivery time for ID cards in Jodhpur depends on order size, customization level, data readiness, and whether production is factory-direct or outsourced. When you work with a factory-direct manufacturer that handles printing, lamination, finishing, and dispatch in-house—such as ID CARD FACTORY—delivery timelines are predictable and faster compared to retail print shops.
Below is a clear, realistic breakdown of delivery timelines and what influences them.
Standard Delivery Timelines for Jodhpur
Delivery timelines usually start after final design and data approval:
Small orders (50–200 ID cards): 3–5 working days
Medium orders (200–1,000 ID cards): 5–7 working days
Large bulk orders (1,000+ ID cards): 7–12 working days
Urgent / priority orders: 2–4 working days (subject to feasibility)
Because Jodhpur is well-connected within Rajasthan, intra-state logistics are typically faster than inter-state shipping.
What Affects ID Card Delivery Time?
1. Manufacturing Model
Factory-direct production: Faster, controlled timelines
Outsourced printing: Slower due to third-party dependency
Factory-direct units avoid delays between printing, lamination, and finishing.
2. Order Quantity
Larger orders take longer due to:
Batch-wise printing
Multi-stage lamination
Quality inspection cycles
However, bulk orders are still faster overall when planned correctly.
3. Customization Level
Custom features such as:
Double-sided printing
Matte or special lamination
Barcodes, QR codes, or RFID readiness
do not significantly increase time if finalized early, but late changes can cause delays.
4. Data Accuracy and Readiness
Clean, verified data speeds up delivery:
Correct spellings and numbering
Properly named photo files
Single, finalized spreadsheet
Data errors are a common reason for reprints and delays.
5. Proof Approval Time
Production generally starts only after proof approval. Faster approvals mean faster dispatch.
Dispatch and Transit Time to Jodhpur
After production and quality checks:
Cards are securely packed to prevent bending or moisture damage
Dispatch is scheduled immediately
Courier transit within Rajasthan usually takes 1–2 working days
Local pickup options may reduce time further.
How to Get Faster Delivery in Jodhpur
To minimize turnaround time:
Choose a factory-direct manufacturer
Finalize specifications before submitting data
Approve proofs promptly
Avoid last-minute design or data changes
Place bulk orders instead of multiple small batches
These steps significantly reduce total delivery time.
Common Reasons for Delays
Incomplete or incorrect data
Multiple design revisions
Choosing vendors that outsource production
Ordering during peak academic or onboarding seasons without advance planning
Avoiding these ensures smooth and timely delivery.
Conclusion
For organizations asking how long it takes to deliver ID cards in Jodhpur, the realistic answer is 3 to 7 working days for most orders, with bulk orders taking up to 12 working days depending on quantity and specifications. When produced by a factory-direct manufacturer with in-house lamination and dispatch, ID card delivery to Jodhpur is fast, reliable, and predictable.




Comments